Warning:
JavaScript is turned OFF. None of the links on this page will work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: A2, Poor Operation and Maintenance leads to Major Building Systems, Design Defects due to poor analysis, Elevated Energy Use from Undersizing of Major Equipment, Compromises Indoor Air Quality and Comfort by Insufficient Maintainence of Equipment, Compromises Indoor Air Quality and Comfort by Inadequate Insulation, Elevated Energy Use from Lack of Energy Efficient Equipment, Intelligent Building which is Detailed Here, poor analysis of Lighting & Electrical System, Resolutions Could be to Put Controls to Regulate Temperature, Author:Julie Coyle Date: 4/24/08 Links to A2 - Building Problems, Resolutions Could be to Install Daylight Sencors on Lighting Fixtures, Poor Operation and Maintenance because Resolutions, poor analysis of Structural System, Poor Operation and Maintenance because Allowing Manual Control, Poor Operation and Maintenance because Lack of Knowledge About Equipment, poor analysis of HVAC System, Elevated Energy Use causes Major Building Systems, Resolutions Could be to Train/Hire Maintainance People who are Qualified, Compromises Indoor Air Quality and Comfort which Major Building Systems, Problems in Existing Buildings Generates from Design Defects