Warning:
JavaScript is turned OFF. None of the links on this page will work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Assignment 2 - EuniceHameyie, Design problems Problems? Upon end of construction phase no final model/design available of all systems, IB - Main characteristics my focus is linked HERE An IB, Today's building Problems 3 considered, Problems with IB Linked HERE 4 problems considered with concept of IB, By Eunice Hameyie April 23, 2008 for AE 790, A2 ???? Link to student work, 3 considered 1 Occupant discomfort, Design problems how they are solved with IB? Powerfull tools such as REVIT enable integration of all designs into a single model readily available ---> save time, cost and stress, Today's building can benefit if becomes An IB, Commissioning how IB can help? Data on performance readily accessible Building can determine its own problems and self adjust ---> less time (lesser jobs too) but more efficient commisioning and maintenance, Assignmnet 6 - Chi and Eunice linked to final project Assignment 2 - Opportunities with Intelligent Buildings (IBs), Commissioning Problems? Building commissioning is a process --> requires continually updated information about the building and its perfomance Not always available, 3 considered 2 Design problems, An IB concept of an IB can be handicaped by 4 problems considered with concept of IB, Occupant discomfort Problems? temperatures never satisfying, Occupant discomfort Problems? Not enough ventilation, 3 considered 3 Commissioning, Occupant discomfort How IB concept can solve it? Comfortable indoor requirements ranges are determined The control systems can vary indoor conditions to meet comfort requirements and enhance productivity Self-adapting and quicker response--> reduce waiting period, Building commissioning is a process --> requires continually updated information about the building and its perfomance Not always available results in Needs to spend time and money to obtain consistent performance data, Commissioning Problems? Upon end of construction phase no final model/design available of all systems, 7 factors expanded upon HERE IB - Main characteristics